Safety Focused Performance Joint Venture (SFPJV)

The Melbourne Water Major Capital Delivery Program for design, construction and rehabilitation services commenced in June 2018. The program comprises capital works and renewal projects across both water and sewerage assets, with a forecast annual capital-spend of approximately $200m over 10 years. The Safety Focused Performance Joint Venture (SFP), a partnership between Abergeldie, Downer, and Stantec, is one of two service providers competing and delivering work packages under the program.

Client

Melbourne Water

Year

In Progress

Region

VIC

Share

Safety, Health and Wellbeing

Melbourne Water’s (MW) focus is on a generative safety culture and self-performance, with direct access to Abergeldie staff carrying out works and managing risk. Both delivery service providers attend safety forums convened by MW to share safety and wellbeing learnings and ideas in a noncompetitive environment. The drive of the SFP Joint Venture has been to maintain a zero TRIFR.

Value for Money and Trust

The Melbourne Water framework for the program is based on collaboration, value for money and trust. Value for money is maximized by service provider self-performance self-perform, avoiding margin on margin where practicable. For most work packages, award is based on an upfront agreement regarding margin, overheads, labour and plant costs.

Label

ETP HV-LV Renewals & HV-62A Switchboard

Construction of new high voltage redundancy for current electrical assets and renewal of existing assets for ongoing operations at the Eastern Sewerage Treatment plant.

Label

Label

ETP Recuperative Thickener

To increase the sludge digestion capacity without building additional digester tanks, by implementing Recuperative Thickening.

Label

Label

Yan Yean WTP Upgrade

Upgrade to the existing plant treatment processes and many of the existing assets, including required replacement as they are now at the end-of life and/or do not meet current Melbourne Water standards.

Label

Label

Holden Reservoir Inlet Pipeline

Construction of a 3.25 km 1150 mm diameter pipeline along Melton Highway, to meet the increased demand of the rapidly expanding Melton-Caroline Springs area.

Label

Label

REFCL Tranche 2 Electrical Compliance

A REFCL is a type of electricity network protection device that operates similar to a safety switch. The REFCL limits the amount of energy released at the location of a fault when an earth fault occurs on a powerline.

Label

Label

WTP Electrical Reliability

This project is a collaboration between SFPJV and Melbourne Water, which aims to renew, automate and optimise the existing high voltage system at the Werribee Treatment Plant, as well as building modifications to meet current MW requirements.

Label

Label

Hawthorn Main Sewer Rehabilitation

Renewal of the deteriorating assets in the Hawthorn Main Sewer. The Rehabilitate of the main sewer will reduce the risk of asset failure and extend the life of the assets.

Label

Label

ETP Large Scale Renewable Energy Land Rehabilitation

Bulk earthworks and placement of biosolids and capping materials over a 42ha site, to prepare for a future large scale solar energy project.

Label

Label

Lillydale Lake Wetland Rectification

Restore stormwater treatment function to wetland, while improving the safety and maintainability of the wetland and improving the habitat and amenity of the site.

Label

Label

Winneke Main Sub Station Switchboard Replacement

Replacement of the aging high voltage switchgear at the Winneke Main Substation.

Label

Label

Arnolds Creek

Part of Melbourne Water’s Reimagining Your Creek pilot program to demonstrate how urbanised creeks and drains improve quality, accessibility, visual and ecological value of public open space.

Label
RELATED PROJECTS
Grahamstown Wastewater Treatment Plant Upgrades
Hunter Water Minor Works Panel
Wastewater Treatment Plant mid-construction
Canberra Wastewater Network Access Program
Network Facilities Renewal Program
Network Facilities Renewal Program
Tin Can Bay and Cooloola WTP
Tin Can Bay, Rainbow Beach and Cooloola Cove
Bonnyrigg Reservoir Refurbishment
Bonnyrigg Reservoir Refurbishment