Hunter Water Minor Works Panel
Abergeldie has been part of the Hunter Water minor works panel since 2016 delivering projects of various sizes, scopes, and complexity.
Abergeldie and Hunter Water maintain collaborative program meetings were established with key performance indicators measured and recorded ensuring Program objectives of Safety, Quality, Environment, Community and Stakeholder, Value for Money, and cost objectives were achieved.
Client
Hunter Water
Year
In Progress
Region
NSW
Burwood Beach UV Systems Upgrade
Design, construction, testing and commissioning of a new UV disinfection system to upgrade the output quality at the existing Burwood Beach Wastewater Treatment Plant.
Seaham Weir Refurbishment Early Tender Involvement
Constructability advice on how to undertake refurbishment of the existing weir and gate structures as well as construction of a new fish ladder. Advice on coffer dam, sheet piling, dewatering, rock armouring, erosion protection, excavation, crane placement for weir refurbishment and installation of prefabricated panels for fish ladder.
Kurri Kurri WWTW
New Chemical dosing system including replacement of chemical dosing tanks, pumps, valves, instrumentation and control, safety equipment, bunding, unloading bay, metal roof, fencing.
Grahamstown WWTP Upgrade
Replacement of the sludge removal system in the four sedimentation tanks and associated mechanical, electrical and communication works.
Cessnock WWTW Early Contractor Involvement
Early Contractor Involvement for the brownfield D&C upgrade of Cessnock WWTW including new secondary treatment process, refurbishment and remediation of existing concrete structures, electrical renewal and upgrade to existing electrical assets, decommissioning and demolition of existing trickling filter plants.
Farley Clarifier Upgrade
Upgrade and associated chemical dosing systems - Abergeldie was engaged to design, construct, install and commission new facilities to increase aeration capacity at an existing wastewater treatment plant.