Bonnyrigg Reservoir Refurbishment

Abergeldie delivered the Bonnyrigg Reservoir Refurbishment project through a collaborative framework with Sydney Water Corporation. Delivered in a tight shutdown period with much of the works carried out at heights under confined space conditions, scope included the demolition of the existing metal clad roof and structural steel support frame and access, refurbishment of existing ancillary equipment, installation of new steel support framework, and sheeting, hand railing and access.

Client

Sydney Water

Year

2017

Region

NSW

Share

m
Reservoir Diameter
ML
Storage Capacity
m
Reservoir Depth
RELATED PROJECTS
Safety Focused Joint Venture Logo
Safety Focused Performance Joint Venture (SFPJV)
Grahamstown Wastewater Treatment Plant Upgrades
Hunter Water Minor Works Panel
Wastewater Treatment Plant mid-construction
Canberra Wastewater Network Access Program
Network Facilities Renewal Program
Network Facilities Renewal Program
Tin Can Bay and Cooloola WTP
Tin Can Bay, Rainbow Beach and Cooloola Cove