Yarra Valley Water Sewer Mains Renewals Program

Abergeldie and Yarra Valley Water are working together to ensure reliability of water supply in Melbourne through the ongoing Sewer Mains Renewals Program. Abergeldie is engaged to complete investigation, design, and construction of the rehabilitation of sewers ranging in diameter from 100mm to 900mm through various rehabilitation methodsThe program also involves the rehabilitation of property connection sewers and civil spot repairs. 

Client

Yarra Valley Water

Year

In Progress

Region

VIC

Share

mm
Range in liner Diameters
m
Range in Liner Depths
Year Client Relationship

2021

16683.52m in length so far

2020

28105.75m in total length

2019

33935.09m in total length

2018

33038.15m in total length

2017

32286.6m in total length

2016

8163.47m in total length

RELATED PROJECTS
Safety Focused Joint Venture Logo
Safety Focused Performance Joint Venture (SFPJV)
Grahamstown Wastewater Treatment Plant Upgrades
Hunter Water Minor Works Panel
Wastewater Treatment Plant mid-construction
Canberra Wastewater Network Access Program
Network Facilities Renewal Program
Network Facilities Renewal Program
Photo of a relining truck next to a residential area where they are rehabilitating the stormwater
Gold Coast Stormwater Relining Program