OUR PROJECTS

Providing the Complex Infrastructure Needed to Build Better Communities

Burwood Beach UV Treatment Plant

Engaged by Hunter Water, Abergeldie delivered design, construction, testing and commissioning of a new Ultraviolet disinfection system to upgrade processing capacity and output quality at the existing Burwood Beach Wastewater Treatment Plant. These upgrades were essential to ensure the plant complied with an Environmental Protection Authority (EPA) pollution reduction program (PRP).

Client

Hunter Water

Year

2017

Region

NSW

Share

ML
Treated Per Day
Population Size Using Plant
Disruption to Normal Operations
RELATED PROJECTS
Safety Focused Joint Venture Logo
Safety Focused Performance Joint Venture (SFPJV)
Grahamstown Wastewater Treatment Plant Upgrades
Hunter Water Minor Works Panel
Wastewater Treatment Plant mid-construction
Canberra Wastewater Network Access Program
Network Facilities Renewal Program
Network Facilities Renewal Program
Tin Can Bay and Cooloola WTP
Tin Can Bay, Rainbow Beach and Cooloola Cove